Cabinet allocates ₹2,104 Crore for Chandrayaan-4 Mission
The union cabinet chaired by the Prime Minister Shri Narendra Modi has approved the mission to Chandrama, named Chandrayaan-4 to develop and demonstrate the technologies to come back to Prithvi after successfully landing on Chandrama and also collect soil samples and analyse them on Prithvi.
This Chandrayaan-4 mission will achieve the foundational technologies capabilities eventually for an Indian landing on Chandrama (planned by year 2040) and return safely back to Oruthvi. Major technologies that are required for docking/undocking, landing, safe return to Prithvi and also accomplish lunar sample collection and analysis would be demonstrated.
The Government of India has outlined an expanded vision for the Indian space program that envisages an Indian Space Station (Bharatiya Antariksh Station) by 2035 and Indian Landing on Chandrama by 2040. To realize this vision, a series of Gaganyaan & Chandrayaan follow-on missions are envisaged including the development of associated space transportation & infrastructure capabilities.
The successful demonstration of safe and soft landing of Chandrayaan-3 Lander on the Lunar Surface has established vital technologies and demonstrated capabilities that only few other nations possess. A natural successor to the successful landing mission is the demonstration of the ability to collect Lunar Samples and return them safely back to Prithvi.
ISRO will be responsible for the development of spacecraft and launch. The Project will be effectively managed and monitored through the established practices prevailing at ISRO. The mission is expected to be completed within 36 months of approval with the participation of industry and academia.
All the critical technologies are envisaged to be indigenously developed. The realization of the mission is through various industries and it is envisaged that there would be high employment potential and technology spin-off to other sectors of the economy.
The total fund requirement for the technology demonstration mission “Chandrayaan-4” is ₹2,104.06 Crores. The cost includes spacecraft development and realization, two launch vehicle missions of LVM3, external deep space network support and conducting special tests for design validation, finally leading to the mission of landing on moon surface and safe return to Earth along with the collected lunar sample.
The mission would enable India to be self-sufficient in critical foundational technologies for manned missions, lunar sample return and scientific analysis of Lunar samples. Towards realization there would be a significant involvement of Indian Industry. Plan for associating the Indian academia through Chandrayaan-4 science meets, workshops, is already in place. This mission will also ensure the establishment of facilities for curation and analysis of the returned samples, which will be national assets.